欧美亚洲中日韩中文字幕在线,日韩视频在线免费,亚洲午夜视频在线观看

Shandong Water Conservancy Construction Group Co.,Ltd
Chinese
English
Contact Us  
Tel:+86 0537-2270579
Fax:+86 0537-2270579
E-mail:[email protected]
News
 

Accelerating progress mobilization meeting in the flood season held By SDWP international company at DESWSP project in Bangladesh

                                                                                             2019-07-19


On July 8, the Bangladesh DESWSP project of SDWP international company held an accelerating progress mobilization meeting in the flood season. The meeting centered on the analysis and summary of the problems existing in the construction process at the present stage, proposition of solutions, clarification of the importance,management ideas and the emergency work task in flood season to guaranteed the construction progress.

The meeting analyzed and summarized the construction of the project cofferdam, the filling of the construction area and the management of the local labor, and put forward the following requirements for the next stage of the project management: Firstly, it is necessary to strengthen the labor management system, strictly manage the temporary local labor during the emergency period, strengthen communication and coordination among various departments and teams, feedback and communicate problems in time, and solve them in a timely manner. Secondly, it is necessary to improve the importance of safety management in the construction, especially for the site construction personnel who must wear safety hats, safety shoes and other labor protection appliances, for putting up a conspicuous warning sign at the location of the hidden danger; thirdly, each construction group is required not to stop work during the rainy season, overtime to ensure the construction progress of the project.

The meeting stressed that under the current political situation in Bangladesh, it is necessary to strengthen the safety and civilized construction and standardized construction of the project, strengthen the safety measures for projects in flood season, strengthen the monitoring of rain and water conditions, make good emergency plans, and ensure the safety of construction personnel.




Link

Copyright  Shandong Water Conservancy Construction Group Co.,Ltd
Add:No. Ten East Road, 33399 Shuifa tower, Ji'nan (The intersection of ten East Road and Tang Ye Xi Road)    Tel:+86 0531 80876106    E-mail:[email protected]

<pre id="ksndt"></pre>
<menuitem id="ksndt"></menuitem>

    主站蜘蛛池模板: 洛川县| 易门县| 监利县| 临泉县| 新和县| 宝清县| 祁东县| 邛崃市| 陇西县| 墨竹工卡县| 青田县| 梅河口市| 和林格尔县| 大连市| 崇信县| 宣威市| 上饶市| 友谊县| 织金县| 道真| 无棣县| 蓬溪县| 贺兰县| 泰和县| 尉犁县| 新营市| 巨鹿县| 宁蒗| 乌恰县| 玛曲县| 毕节市| 当阳市| 鹿邑县| 兴国县| 宁阳县| 木兰县| 宜都市| 从江县| 满城县| 阿拉善左旗| 酒泉市|