欧美亚洲中日韩中文字幕在线,日韩视频在线免费,亚洲午夜视频在线观看

Shandong Water Conservancy Construction Group Co.,Ltd
Chinese
English
Contact Us  
Tel:+86 0537-2270579
Fax:+86 0537-2270579
E-mail:[email protected]
News
 

The industrial water source conversion project (water transfer pipeline project) of Guangrao County officially jacked in the second line of Jiqing

                                                                                             2020-01-08

On January 5 , the pipe jack construction of the second line of the Jiqing-Qingdao water transfers / transferred pipeline project undertaken by Shandong Water Construction was officially jack . The water transfers / transferred pipeline projects / projected uses two DN1200 pipelines to transport the water from Gaodian Reservoir to the industrial water plant and Zihe Reservoir . The completion of the project will effectively guarantee the water used by industrial enterprises in Guangrao County . The water transfer pipeline intersects with the Jiqing Second Line natural gas pipeline in Dahuantai Village , Guangrao County . The Jiqing Second Line is a high-pressure natural gas pipeline , and our pipeline is designed to pass through the Jiqing Second Line in an inverted rainbow pattern . The project department shall implement strict on-site surveys of the construction site , including underground soil layers , pipelines and above-ground rivers , bridges , buildings , green environment , etc , determine the location of dewatering wells , working pit depth , guide rail direction , etc , and make the best based of the site environment Construction plan , detailed arrangement of construction measures . This project marks a breakthrough in the construction difficulties of important parts of the water transfer project , and is a big step forward for the complete water connection after the year . Due to the deep pipe jack depth and long precipitation cycle , it is necessary to control the continuous shuttle deep underground and accurately grasp the jack distance . In the future construction , there will be a number of difficult bottlenecks waiting to be broken . The project team will monitor the attitude to the pipe jack machine in real time . Adjust the jack force , speed and excavation volume according to the actual situation to ensure that the pipe jack machine can pass through the underground safely .



Link

Copyright  Shandong Water Conservancy Construction Group Co.,Ltd
Add:No. Ten East Road, 33399 Shuifa tower, Ji'nan (The intersection of ten East Road and Tang Ye Xi Road)    Tel:+86 0531 80876106    E-mail:[email protected]

<pre id="ksndt"></pre>
<menuitem id="ksndt"></menuitem>

    主站蜘蛛池模板: 渭南市| 静宁县| 黑水县| 临西县| 沈丘县| 嫩江县| 大余县| 荣成市| 霍邱县| 肃宁县| 丰原市| 巴马| 肇源县| 周至县| 阜新| 介休市| 元朗区| 南澳县| 柳河县| 汉中市| 通江县| 孙吴县| 益阳市| 迭部县| 吉水县| 宜都市| 青海省| 苗栗县| 通海县| 大厂| 讷河市| 利辛县| 长沙市| 安宁市| 林周县| 石泉县| 湖南省| 右玉县| 鱼台县| 青冈县| 永清县|