欧美亚洲中日韩中文字幕在线,日韩视频在线免费,亚洲午夜视频在线观看

Shandong Water Conservancy Construction Group Co.,Ltd
Chinese
English
Contact Us  
Tel:+86 0537-2270579
Fax:+86 0537-2270579
E-mail:[email protected]
News
 

Bangladesh DESWSP project department of SDWP International company organized safety education and training

                                                                                             2019-09-02


Recently, the DESWSP project department has carried out the safety education and training activities, aiming at strengthening the safety production consciousness and the civilized construction consciousness of the staff and workers. The site construction, technology, logistics and other major management personnel of the Project Department study together the knowledge of safety management at the site.

This training focuses on the Bangladesh government's laws and regulations on safety and civilized construction, as well as the international safety management mode, civilized construction requirements and other aspects, strengthen the "red line" consciousness, and improve the safety quality of the whole staff in an all-round way. The training requires all the staff of the project department to attach great importance to the investigation and treatment of safety hidden dangers, find timely feedback on the problems, strengthen the safety supervision and management on the spot, and achieve the responsibility for the key links, the measures in place, and the supervision in place. After the meeting, all the staff went to the project site to correct the misconduct of the field operators. The operators make the commitment together and adhered to the practice of "safety first." The enterprise security concept of "prevention first, comprehensive treatment and continuous improvement".

Through this construction safety training, all the personnel have further strengthened the consciousness of safety production and safety responsibility, improved the safety prevention ability, and laid a solid foundation for the smooth promotion of project construction production and the smooth completion of the objectives of each goal.



Link

Copyright  Shandong Water Conservancy Construction Group Co.,Ltd
Add:No. Ten East Road, 33399 Shuifa tower, Ji'nan (The intersection of ten East Road and Tang Ye Xi Road)    Tel:+86 0531 80876106    E-mail:[email protected]

<pre id="ksndt"></pre>
<menuitem id="ksndt"></menuitem>

    主站蜘蛛池模板: 手游| 固安县| 封开县| 镇江市| 隆昌县| 合江县| 布尔津县| 渑池县| 邳州市| 襄汾县| 蒙山县| 临桂县| 寻乌县| 开江县| 扎鲁特旗| 潜江市| 孟村| 平阳县| 前郭尔| 遵化市| 泊头市| 彰武县| 斗六市| 拉萨市| 陕西省| 许昌县| 东宁县| 翁牛特旗| 潼关县| 茌平县| 股票| 台州市| 台中市| 阜阳市| 阿坝县| 清水县| 新晃| 广河县| 昔阳县| 吴桥县| 青海省|